Logo ECMS

Digital Library

of the European Council for Modelling and Simulation

Title:

Multi-site aggregate production planning with resilience consideration

Authors:
  • Chenghao Dai
  • Maximilian Schoen
  • Thorsten Claus
  • Frank Herrmann
Published in:

(2024). ECMS 2024, 38th Proceedings
Edited by: Daniel Grzonka, Natalia Rylko, Grazyna Suchacka, Vladimir Mityushev, European Council for Modelling and Simulation.
DOI: http://doi.org/10.7148/2024
ISSN: 2522-2422 (ONLINE)
ISSN: 2522-2414 (PRINT)
ISSN: 2522-2430 (CD-ROM)
ISBN: 978-3-937436-84-5
ISBN: 978-3-937436-83-8 (CD) Communications of the ECMS Volume 38, Issue 1, June 2024, Cracow, Poland June 4th – June 7th, 2024

DOI:

https://doi.org/10.7148/2024-0345

Citation format:

Chenghao dai, Maximilian schoen, Thorsten claus, Frank herrmann (2024). Multi-Site Aggregate Production Planning with Resilience Consideration, ECMS 2024, Proceedings Edited by: Daniel Grzonka, Natalia Rylko, Grazyna Suchacka, Vladimir Mityushev, European Council for Modelling and Simulation. doi:10.7148/2024-0345

Abstract:

The recent years have shown a high frequency of disruptions like natural disasters or manmade disruptions, leading, for example, to transport routes or production facilities being unavailable for extended periods. Many manufacturing companies, which nowadays operate in a global production network, are heavily exposed to these disruptions. This results in both significant costs and substantial exceeding of promised deadlines. If it concerns the first company in a supply chain, it causes correspondingly significant delays in promised deadlines for subsequent companies in the supply chain, including a correspondingly significant increase in costs. Both are exemplified in this paper through a case study. This case study demonstrates that through resilience, both implications can be significantly reduced.

Full text: Download full text download paper in pdf